So, downstairs is up and roof deck is on, time for the acoustic ceiling work.  The standard light fixture sits in the acoustic grid, no need to hang from chains like some lighting.  And these install guys were fast too. Hint: Take a taut string across the room, below the "L" wall angle at 12' from wall to provide  a straight edge to align the "T" bars to when hanging from twist wires screwed to roof deck.

Tongue and groove deck is screwed to the corrugated steel.

Around the perimeter another bottom channel base is screwed.  HINT: Steel beams are going in this second story for a clear span room, the dimension between the opposing steel posts is critical, do not assume the deck is perfectly sized.  Measure across to get the dimension for the channel to set the wall in to match the beam and blue print right NOW.

 


3 - 28 foot steel beams made for clear span room


4 men hiked these beams up using ladders to set them 