So, downstairs is up and roof deck is on, time for the acoustic ceiling work. The standard light fixture sits in the acoustic grid, no need to hang from
chains like some lighting. And these install guys were fast too. Hint: Take a taut string across the room, below the "L" wall angle at 12' from wall to
provide a straight edge to align the "T" bars to when hanging from twist wires screwed to roof deck.
|